IWA Solar Farm

This project involves the design, construction, and commissioning of a new Solar Photovoltaic Farm to supply 1MVA of renewable energy directly to Ireland West Airport. The initiative supports the airport’s sustainability goals by reducing reliance on grid electricity and lowering carbon emissions. The contract will be delivered under a Design and Build model, followed by a 24month Operation and Maintenance phase to ensure optimal performance and reliability of the system. The scope of works includes Full design and engineering of the solar PV system, Procurement and installation of solar panels, inverters, and associated electrical infrastructure, All necessary civil works, including access roads, foundations, cable trenches, and fencing, Integration with the airport’s existing electrical network, Testing, commissioning, and handover of a fully operational system.
CPV-Code: 45315300 71314000 71311000 45200000 45220000 45232220 45223110 31200000 31121300 31100000 71314100 71320000
Abgabefrist: 24.07.2025
Typ: ContractNotice
Status: None
Aufgabe: None
Vergabestelle:
name: Connaught Airport Development Company Ltd
address: Charlestown Charlestown
postal_code: F12P8P9
city: Charlestown - IE
country: IE
email: garyginty@irelandwestairport.com
phone: 0949368194
contact_point: 0949368194 garyginty@irelandwestairport.com
idate: 8. Juli 2025 07:52
udate: 8. Juli 2025 07:52
doc:
authority_types:
activities:
Quelle: https://ted.europa.eu/de/notice/-/detail/00443598-2025
Unterlagen: https://www.etenders.gov.ie/epps/cft/listContractDocuments.do?resourceId=6056630
Zuschlagskriterium: None
Vertrag: None
Prozedur: None
Nuts: None
Veröffentlichung: 07.07.2025
Erfüllungsort: Charlestown - IE
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert 1 100 000,00 €
Anzahl Angebote None