Open Cycle Gas Turbines Total Output 60-115 MWe – "EPC" Contract

Open Cycle Gas Turbines - Total Output 60-115 MWe – "EPC" Contract Dhekelia Power Station, Cyprus The Electricity Authority wishes to install generating units, of total capacity between 60-115MWe under ISO conditions, consisting of between 2-3 gas turbines units of preferably the aeroderivative type, at Dhekelia Power Station (DPS) in CYPRUS. The generating units must have dual fuel capability, Distillate oil (gasoil) or Natural Gas (NG), without limitations on the number of operating hours with either fuel. The generating units will initially operate on gasoil and Open Cycle mode, but will have the capability of being converted into a Combined Cycle Gas Turbine (CCGT) Unit at a later stage, if so decided by EAC. EAC has decided to add two GTs open cycle of approximately 80MWe total capacity, however it can accept two or three new open cycle units having total generating capacity between 60-115 MWe. The Project includes Gas Turbine Generator Sets with their ancillaries
CPV-Code: 45220000 42112300 45200000 45222000 45500000
Abgabefrist: 09.04.2024
Typ: ContractNotice
Status: None
Aufgabe: None
Vergabestelle:
name: Αρχή Ηλεκτρισμού Κύπρου
address: Αμφιπόλεως 11, Στρόβολος 2025, Λευκωσία Λευκωσία
postal_code: 2025
city: Λευκωσία - CY
country: CY
email: purchasing@eac.com.cy
phone: +357 22201655
contact_point: Purchasing Manager +357 22201655 +357 22201660 purchasing@eac.com.cy
idate: 13. März 2024 08:42
udate: 13. März 2024 08:42
doc:
authority_types:
activities:
Quelle: https://ted.europa.eu/de/notice/-/detail/00150898-2024
Unterlagen: https://www.eprocurement.gov.cy/epps/cft/listContractDocuments.do?resourceId=6734641
Zuschlagskriterium: None
Vertrag: None
Prozedur: None
Nuts: None
Veröffentlichung: 13.03.2024
Erfüllungsort: Λευκωσία - CY
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert None
Anzahl Angebote None